| 5. Temperature program |
|
· Inlet temperature T
|
|
| · Outlet temperature T |
|
| · Heat ricovery in %
|
|
| 6. Quantity of sections |
|
| 7. Every section with Inlet / Outlet
nozzle |
Yes
No
|
| 8. Frame with riserve for extension |
Yes
No
|
| 9. Working pressure PWA |
|
| 10. Connection homogenizer |
|
| 11. Connection separator |
|
| 12. Connection temperature keeping |
|
| - Type / system |
|
| - Tubular heating / plate heater |
|
| 13. Circulating control |
Yes
No
|
| 14. Design / Model |
|
|
Frame
AISI 304
|
|
Heat exchanger plates AISI 304
|
|
Heat exchanger plates AISI 316
|
|
other model
|
| 15. Gaskets |
|
| · System sticked / clamp |
|
| · Quality of gasket |
|
| 16. Product connections |
Norm
DN |
| 17. Energy connections
|
Norm
DN |
| 18. Heating medium |
Available
Not
available |
| · Type
|
|
| · Temperature |
|
| · Pressure |
|
| · Quantity |
|
| · Pressure drop |
|
| 19. Cooling medium |
Available
Not available |
| · Type
|
|
| · Temperature
|
|
| · Pressure
|
|
| · Quantity
|
|
| · Pressure drop
|
|
| 20. Cool water |
| · Temperature
|
|
| · Pressure
|
|
| · Quantity |
|
| · Pressure drop
|
|
| 21. Compressed Air
|
| · Inlet Pressure |
|
| · Secondary Pressure |
|
| · Quality |
|
| · Quantity |
|
| 22. Temperature control
|
| · Type/System/SPS |
|
| · Brand |
|
| · Precision / Class
|
|
| 23. Site of installation
|
| · Country |
|
| · Altitude
|
|
| · Location
|
|
| · Workingroom |
|
| · Delivery |
|
| · Position |
|
| 24. Space required |
| · Space |
m3 |
| · Height of room |
m
|
| 25. Type of construction
|
| · Installation on site |
|
| · Modular design ready to
connect |
m
|
| 26. The installation is consisting of: |
| · Presettling tank with level
command / float _valve |
Yes
No
|
· Corner tube filter
|
Yes
No
|
| · Pump |
Yes
No
|
| · Manometer |
Yes
No
|
| · Volume controlling valve |
Yes
No
|
| · PWA |
Yes
No
|
| · Separator |
Yes
No
|
| · Omogenizer |
Yes
No
|
| · Heating maintenance
(maintenance temp)
|
Yes
No
|
· Reversing controller and
temperature _registration pressure registration
|
Yes
No
|
| · Exchanger PWA |
Yes
No
|
| · Heating temperature
regulation |
Yes
No
|
| · Cooling temperature
regulation |
Yes
No
|
| · Control and operation box |
Yes
No
|
| 27. Product lines and chemical cleaning
|
| · Dimensions of the lines |
|
| · Norm of the lines / DIN Inch |
|
| · Norme of the connections DIN,
ISO, Clamp, DS, _SMS, _RJT, DS,
altri |
|
| 28. Installation |
| On site?
Yes No
|
| 29. Electrical energy
|
| · Type of power |
|
| · Current |
Alternating
Continuous |
other
|
| · Tension |
220V
380V 660V
higher than 660V |
| · Frequency |
50 Hz
60 Hz |
| 30. Type of aseptic cleaning |
CIP
lost cleaning
rinse solution |
| |
intermediate rinse
acid
final rinse
|
| Product |
|
| Concentration |
|
| Quantity |
|
| Circolation |
|
| Transport |
|
| 31. Delivery by customer and operations |
|
| 32. Milk Reception
|
| · Weighing |
|
| · Cleaning |
|
| · Cooling
|
|
| · Store |
|
| 33. Milk Preparation
|
| · Separation |
|
| · Regulation fat contenance |
|
| · Thermal tuining |
|
| · Intermediate storage |
|
| 34. Production
|
| · Pasteurization |
|
| · Homogenizing |
|
| · Heat maintenance
|
|
| · Cooling |
|
| · Intermediate storage |
|
| 35. Filling and packaging
|
| · Glas bottles |
|
| · PET bottles |
|
| · Plastic bags
|
|
| · Packaging in carton |
|
| · Volume |
0.25 l
0.5 l 1.0
l 2.0 l
5.0 l |
| 36. Storage final product |
| 37. Capacity of the plant |
| · Production quantity in one hour
............................
|
|
| · Production quantity in one day 8 - 9 h |
|
| · Production quantity in one week / 5 days
. |
|
| 38. Locality available? |
| · M2. |
|
| · Height of locality |
|
| · Tecnical execution for humid production
. |
|
| 39. Locally specialists available (Dairy expert or
similar)? |
|
|
| 40. Are there machines, devices or part of installations
allready available? |
|
|
| 41. Are there some parts , machines, devices, tubes,
fittings not in stainless steel? |
|
|
| |